Logis-Tech was awarded a subcontract to install utilities, aircraft grounding and dehumidification systems for a new 56,700 square feet tension fabric shelter to be erected for Marine Aircraft Group 11 (MAG-11) aboard Marine Corps Air Station Miramar (CA) for controlled humidity protection of F-18 Aircraft. Logis-Tech was also awarded follow-on contractor logistics support for the new controlled humidity protection systems.